| Type | Start-Up Service |
| Form Factor | On-site service |
| Service Target | APC Galaxy 3500/SUVT 20 kVA UPS |
| Applicable Models | Galaxy 3500 20kVA, SUVT 20kVA |
| Function | Professional installation and commissioning |
| Service Mode | Once, at installation |
| Scheduling | Standard business hours |
| Power Requirements | UPS dependent – service does not alter power requirements |
APC START-UP SERVICE for Galaxy 3500/SUVT 20 kVA UPS

Key Benefits
Eye-Insights™ by Eye-In Technologies
AI-Powered Summaries from Online Customer Reviews
AI-Powered Summaries from Online Customer Reviews
Eye-Insights™ are generated by proprietary AI that analyzes real online customer reviews to highlight top pros and key product features. While we aim for accuracy, insights are provided “as-is” and individual results may vary.
- Ensures correct installation by APC-certified professionals for optimal UPS deployment
- TAA-compliance makes it suitable for U.S. government and federal contracts
- Minimizes risk of installation errors that may impact system performance
Product Overview
The APC START-UP SERVICE (WSTRTUP-G3-22) offers professional installation for one Galaxy 3500 or SUVT 20 kVA UPS. This ensures manufacturer-compliant setup and reduces commissioning errors. Made in the U.S. and TAA-compliant, it suits regulated sectors. Ideal for data centers and enterprise deployment, it accelerates setup and supports long-term performance.
Specifications
Product Overview
Physical & Environmental
| Service Environment | On-site with customer UPS installation |
| Installation Location | Indoor data center or IT facility |
| Physical Visit Required | Yes |
Cloud Management & Licensing
| Remote Cloud Management | No (local professional service) |
| License Required | No |
| Included Cloud Features | |
| Support for Management Software Integration | Yes, via APC UPS management software after start-up |
Service Features
| Service Included | Installation |
| Technician Certification | APC-certified field service engineers |
| Scope | Single UPS unit |
| Lead Time Before Scheduling | Typically 7–14 days |
| Travel Charges Included | Yes |
| Reports Delivered | Startup checklist and commissioning report |
| Warranty Impact | Ensures product warranty is upheld |
| Customer Training Provided | Brief operator orientation provided post-install |
| Post-Installation Support | Basic Q&A during site visit |
Interfaces
| Communication Interfaces Involved | Local network or serial connection to UPS |
| Configuration Interface Enabled | Yes (via UPS management panel and/or network management card) |
Compliance & Origin
| Country of Origin | United States |
| TAA Compliance | Yes |
| Energy Star Compliant | |
| Certifications | TAA Compliant; Manufacturer-certified service |
Advanced Security Features
| User Access Configuration | Set up by technician per customer policies |
| Cybersecurity Hardening | Recommended during service if applicable |
| Monitoring Configuration | Yes, includes configuration of network monitoring |