| Service Type | 7x24 Startup Service |
| Supported Device | 40kVA UPS/Battery Frame |
| Form Factor | On-site professional service |
| Availability | 24/7 (7x24) |
| Purpose | Startup configuration and commissioning of UPS systems |
| Vendor | APC by Schneider Electric |
| Product Category | Installation Services |
| Service Delivery Method | Factory-certified field technician deployment |
| Scheduling Lead Time | Typically 7–10 business days in advance |
| Service Scope | Functional verification of hardware and software, startup and commissioning of system |
| Power Capacity Supported | 40 kVA UPS |
| Included Services | Site inspection, UPS installation verification, startup & basic operator training |
APC 7x24 Startup Service for 40kVA UPS/Battery Frame

Key Benefits
AI-Powered Summaries from Online Customer Reviews
Eye-Insights™ are generated by proprietary AI that analyzes real online customer reviews to highlight top pros and key product features. While we aim for accuracy, insights are provided “as-is” and individual results may vary.
- Provides 24x7 access to certified startup technicians, reducing downtime during initial deployment.
- TAA compliance ensures federal and government project eligibility, simplifying procurement processes.
- Specifically tailored for 40kVA UPS/Battery Frame environments, ensuring compatibility and optimal system integration.
Product Overview
The APC 7x24 Startup Service for 40kVA UPS/Battery Frame, part number WUPGSTRTUP7-UG-01, offers around-the-clock setup support from certified professionals to configure and commission critical power systems. Designed for 40kVA UPS and battery frame deployments, this service is TAA-compliant and manufactured in the United States, making it ideal for sensitive or government installations. With its placement under Product Add-Ons > Installation Services, this install package is essential for ensuring optimal performance during system startup in mission-critical environments.
Specifications
Product Overview
Physical & Environmental
| On-site Service Required | Yes |
| Installation Preparedness Requirement | Physical installation complete, power available, batteries installed prior to service |
| Service Environment | Indoor, controlled access data center or equipment room |
| Customer Responsibility | Ensure prerequisites are met and personnel are available for access and onboarding |
Cloud Management & Licensing
| Cloud Integration | Not directly applicable; service does not include hardware enablement for cloud |
| License Requirements | None required specifically for startup service |
| Included Cloud Features | Not applicable |
| Remote Monitoring Activation | Can be enabled if hardware supports it; not included by default |
Interfaces
| Remote Access Support | Optional via Schneider remote monitoring (if hardware supports it) |
| Configuration Interfaces Required | Depends on supported UPS model – typically LCD HMI or network management card |
Compliance & Origin
| Country of Origin | UNITED STATES |
| TAA Compliance | Yes |
| Service Compliance Standards | Meets Schneider Electric quality assurance and safety protocols |
Advanced Security Features
| Security Configuration | Startup includes setting administrative passwords if supported |
| Secure Setup Procedures | Follows secure commissioning standards per manufacturer procedures |
| Auditing/Logging Support | Not included, but hardware may support event logs post-service |
| Firewall Settings | Not included; responsibility of on-site IT or hardware configuration |
| User Access Control Setup | Will assist in setting user controls during commissioning if supported |
| Compliance with Data Security Standards | Service follows industry best practices but depends on installed hardware capabilities |