APC WSTRTUP-G3-21 Start-Up Service for Galaxy 3500/SUVT 10–15kVA UPS

VENDOR: APC Mfg Part#: WSTRTUP-G3-21
Skip to product information
1 of 1
Photo is for illustration purposes only. Actual product may be different.
Regular price $1,309.81
Regular price Sale price $1,309.81
Sale Sold out
MSRP: $1,945.00
Shipping calculated at checkout.
  • Start-up service for one Galaxy 3500 or SUVT 10–15 kVA UPS
  • Performed by certified APC professionals
  • Manufactured in the United States
  • TAA compliant for government applications

Shipping & Returns

All our products can be shipped anywhere in the Continental United States.

View our shipping and returns policy

View full details

Key Benefits

Eye-Insights
  • Ensures reliable and compliant UPS startup by certified APC service personnel.
  • Supports TAA compliance requirements, making it suitable for government and federal use.
  • Reduces risk of improper installation, improving long-term system reliability and ROI.

Product Overview

The APC WSTRTUP-G3-21 Start-Up Service provides professional commissioning for a single Galaxy 3500 or SUVT 10–15 kVA UPS. It includes configuration, testing, and startup procedures by an APC-certified engineer. The service is manufactured in the United States and is TAA compliant, making it suitable for federal or enterprise infrastructure projects. Leveraging this service ensures reliable UPS performance, enhances uptime, and fulfills compliance and warranty requirements in mission-critical deployments.

Specifications

Product Overview

Type Start-Up Service
Service Scope Commissioning of Galaxy 3500 or SUVT 10–15 kVA UPS
Service Level On-site start-up
Compatible UPS Models Galaxy 3500 / SUVT 10–15 kVA
Service Duration One-time service
Service Availability Normal business hours, Monday–Friday
Service Region Domestic (USA)
On-site Engineer Qualification Factory-certified APC Field Service Engineer
Warranty Activation Support Included if required for coverage

Physical & Environmental

Service Location Requirements UPS system must be fully installed and electrically complete prior to service
Typical Site Access Time Within 5 business days from scheduling
Preparation Requirements UPS equipment and utility power must be available and operational

Cloud Management & Licensing

Remote Monitoring Configuration Support Provided when applicable
Licensing or Subscription Required No
Includes Digital Documentation Yes, provisioning and performance report
Cloud Integration During Start-Up Supported for EcoStruxure-enabled UPS

Interfaces

Customer Scheduling Method Co-ordination required prior to onsite deployment
Service Reporting Post-start-up performance report provided

Compliance & Origin

Country of Origin UNITED STATES
TAA Compliance Yes
RoHS Compliance Yes
Contractual Service Type Standard Start-Up (WSTRTUP-G3-21)
Manufacturer Certification APC-certified
Federal Deployment Compliance Compliant with federal procurement requirements

Advanced Security Features

Configuration Validation Ensures system settings for reliable protection
Safety Checks Performed Yes, as defined in APC commissioning procedures
Electrical Verification Performed for operational readiness
Risk Mitigation Procedures Tested prior to release of system to customer
Critical Load Simulation Available depending on site configuration
Surge and Fault Isolation Testing Performed during commissioning
Final System Status Validation Included in post-commissioning report
Service Registration Requirement Required before service dispatch