Service Type | Scheduled Assembly Service |
Compatibility | APC InRow RD10 kW Water/Glycol and Air Cooled Systems |
Service Model | 5X8 – Business hours support, weekdays only |
Purpose | Professional setup and integration of InRow cooling units |
On-Site Service | Yes |
Technician Type | Certified APC Field Technicians |
Service Coverage Hours | 8 hours per day, 5 days per week (Monday–Friday, business hours) |
Service Duration | One-time assembly event |
Scheduling Requirements | Advanced scheduling required with APC representative |
Support Scope | Assembly and installation support without operational interruption |
APC WASSEM5X8-AX-15 Scheduled Assembly Service 5X8 for InRow RD10 kW


Key Benefits

AI-Powered Summaries from Online Customer Reviews
Eye-Insights™ are generated by proprietary AI that analyzes real online customer reviews to highlight top pros and key product features. While we aim for accuracy, insights are provided “as-is” and individual results may vary.
- Ensures professional, manufacturer-approved installation of critical InRow cooling systems
- TAA compliance supports eligibility for public sector and federal contracts
- 5X8 scheduling minimizes interruptions and allows for planned data center integration
Product Overview
The APC WASSEM5X8-AX-15 is a Scheduled Assembly Service designed specifically for InRow RD10 kW Water/Glycol and Air cooled systems. With a 5X8 delivery model, the service is performed by trained APC technicians during regular business hours on weekdays, helping data center managers and IT teams maintain reliable thermal management infrastructure without interrupting regular operations.
This service is ideal for mission-critical environments where precise thermal regulation is essential and installation must adhere to high standards of compliance and performance. As a TAA-compliant service offering, it meets US government procurement requirements, underscoring its suitability for public sector or federally contracted projects. The service originates in the United States, ensuring localized expertise and logistical support.
Organizations deploying or upgrading their APC InRow cooling units can rely on this scheduled service to ensure professional setup, optimize system performance, and minimize post-installation issues—ultimately reducing total cost of ownership by avoiding delays and complications.
Specifications
Product Overview
Physical & Environmental
Service Performed At | Customer site |
Facility Requirements | Customer must prepare site according to APC site readiness guidelines |
Cloud Management & Licensing
Customer Portal Access | Available upon scheduling for coordination and documentation |
Contractual Terms | Single-use service contract tied to MPN WASSEM5X8-AX-15 |
Installation Validation | Validation against APC installation standards and required performance benchmarks |
Documentation Provided | Installation report and service completion record |
Interfaces
Included Installation Interfaces | Thermal management physical infrastructure (mechanical and electrical hookup assistance) |
Compliance & Origin
Country of Origin | United States |
TAA Compliance | Yes |
Compliant for Federal Procurement | Yes |
Regulatory Compliance | Meets procurement requirements for U.S. Government installations |
Advanced Security Features
Contractor Screening | APC-certified personnel vetted for secure environment compliance |
Secure Site Protocols | Adheres to customer-required clearance and security procedures |
Operational Disruption Risk | Minimized through planned installation process |
Installation Standards | Compliant with APC best practices and mission-critical infrastructure requirements |
Change Management Support | Technicians align with enterprise change protocols as needed |
Risk Assessment | Performed as part of scheduling consultation |
System Optimization | Correct assembly ensures thermal optimization and minimizes heat zones |
Post-Installation Risk Reduction | Decreases likelihood of component stress or cooling inefficiencies |
Site Readiness Review | Checklist validated prior to technician dispatch |
Installation Quality Assurance | Measured against APC assembly QA practices |
Logistics and Parts Handling | Carried out under APC supervision to protect system integrity |